Works carried out to date include:
- Installation of a large diameter pipe through the base of the dam
- Construction of downstream erosion protection
- The dam is presently not capable of storing water except for short durations during large flood events (>20 years average recurrence interval) when inflows exceed the capacity of the pipe. Consequently, there is no longer a risk of a "sunny day" dam break event, as the dam does not normally store water.